Was able to get back out into the shop recently and was able to get a few things done.
Finished cleaning up the frames and welded the plates on.
You must be registered for see images attach
You must be registered for see images attach
Cut out the old low hanging cross member and replaced it with a .25 x 2.5 x 2.5 square tube tucked up nice.
You must be registered for see images attach
You must be registered for see images attach
Then it was time to start working on the new to me front Dana 60.
Got it back in the shop and on the stand
You must be registered for see images attach
Cut all the factory bracketing off
You must be registered for see images attach
Removed all the age and scale off and put a coat of POR15 on the pumpkin
You must be registered for see images attach
You must be registered for see images attach
The truss 80% fully welded on. Need to finish welding truss and start getting the new axle brackets welded on for the 4 link.
You must be registered for see images attach
Once all the welding is done the axle will be fully disassembled, refinished and rebuilt with new bearing seals and anything else that needs to be replaced.