95 Long bed Reg Cab named "Stitch"

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

MrPink

Bainisteoir Páirteanna
Joined
Jan 12, 2021
Messages
1,658
Reaction score
3,310
Location
Saginaw Mi
Nice, yeah, I already got the front bumper.

Things to get done ASAP

Pull the clamshells off the 350
Remove Torque converter
Get wooden dolly for putting trans on to move it around(unsure if i am going to convert it to 96+ yet and run it)
Start thinning out the TBI engine harness to mate it to the LS harness
Send mass pile of metal out to get sandblasted and buy more steel-it coating
 

Wh4t3v3rs

I got real bass!!!!
Supporting Member
Joined
Jun 9, 2020
Messages
1,616
Reaction score
5,310
Location
Kansas
Here's a pic of between my radiator and intercoolers. Plenty of room for trans cooler....

You must be registered for see images attach
 

MrPink

Bainisteoir Páirteanna
Joined
Jan 12, 2021
Messages
1,658
Reaction score
3,310
Location
Saginaw Mi
You must be registered for see images attach


This degreaser is pretty good did a single spray down of the engine crossmember and used a a stiff wire brush so far on it. I am getting a pair of tires and will be using my cherry picker to pull the frame out and power wash it.

Before:

You must be registered for see images attach

After:
You must be registered for see images attach
 

MrPink

Bainisteoir Páirteanna
Joined
Jan 12, 2021
Messages
1,658
Reaction score
3,310
Location
Saginaw Mi
Moved the Holley 60PSI AdjFPR last night, you can see its previous home was closer to the trans tunnel. I should have better luck reaching it here, compared to with the TBI engine installed. I also need to re-route the fuel lines under the truck too. Oh! don't mind the neon green zip-ties they are just on the return line(s) to mark them as such.

You must be registered for see images attach
 

MrPink

Bainisteoir Páirteanna
Joined
Jan 12, 2021
Messages
1,658
Reaction score
3,310
Location
Saginaw Mi
C.A.D(cardboard aided design) for the P/S pass-through. I need an 8-pin bulkhead connector though, as I am only using 8 out of the orig 23.

You must be registered for see images attach
 
Top