Ok, so I promised pictures, so hopefully tapatalk will cooperate.
Here is the measurement I come up with from measuring the other axle and some minor changes between axles and flanges, that is 2 1/4 inches from mounting surface to mounting surface
You must be registered for see images attach
Note they are turned 45° from each other, so they are oriented just like the NBS axle
You must be registered for see images attach
Then it was a matter of greasing all the new parts and cleaning the old ones and putting it all together.
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
And now the semi-final product, now that I know it all fits, I'm going to tear it back down and clean up and coat the axle. Then it's off for a re gear and locker
I will say that everything went together without issue, but I did clean up around the axle hub so the rotor would slide on a bit easier.
You must be registered for see images attach
Sent from my SM-G960U using Tapatalk