Have a 5 day weekend for Christmas so I'm getting the rear of the dually done. Hope to have it finished by Sunday night so I can fit the new bed. Flip the axle and took the two overload springs out. Made my own lower plates. Had 3/4" u-bolts bent. And get the notches welded up. Tomorrow going to get them welded into the truck frame and start on the gooseneck hitch. Here are some photos.
You must be registered for see images attach
You must be registered for see images attach
Before
You must be registered for see images attach
After with larger center pin
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
You must be registered for see images attach
Sent from my iPhone using Tapatalk