sooooo, we didn't get near as much done as we wanted to. I got really really tired after we ate, so we called it a day(7:30). We got the KP 4link fully bolted on with the exception of the panhard bar. I wanted to wait until we got the notches and brackets welded in & re-routed the brake line before we got the panhard bar on. The passenger side notch is about 85% welded in, but we haven't started on the drivers side. Dad showed me how to weld & left me some angle iron to practice on, so im going to spend some time tomorrow and the next day practicing. Then maybe by the middle of the week i'll be good enough to work on it w/o waiting another 3 weeks before i gets off work to come weld for me. If not, ill just wait on him. Basically, the teaser pics is as far as we got.