As everybody here knows, I am an aircraft sheetmetal mechanic and I run a sheetmetal shop for a major air carrier. Well myself, and the crewchief opposite of me at the heavy check base I work at were "voluntold" that we would take over the GSE (ground support equipment) shop in addition to our regular duties. Dedric and I are both car guys and the last of the make it happen with what you got mechanics. So we naturally fit right in. Most of this stuff runs ford 300 straight 6 engines, with a few 2.3L ford 4 poppers, a Huffer cart (air start unit) with a detroit 8V72 and 2 GPUs (ground power units) that use Cummins 12BT engines. So we have been whipping things in shape the last 2 months. Getting these guys to run like a well oiled machine. One of the projects i made over the weekend to help them is this heavy duty peg hook setup for saw blades, hose clamps, and tape rolls. Prior to this everything was shoved in boxes. It will be hung on the wall.